New customer story: LeadsIt, the B2B prospecting app we built with AI. Read the customer story →

Use case · Operations and quality teams

Document quality control with AI

The agent reads the document sets that come with a delivery or a quality file, compares them with the order, the specifications and your requirements, and lists missing or inconsistent information. Your quality team decides.

Sourced answer

Le préavis de résiliation est de 90 jours pour les contrats cadres 1 et de 30 jours pour les avenants signés après 2024 2.

1Contrat-cadre_2023.pdf · p. 14
2Avenant_n3.docx · §4.2
3Politique_achats.md

The observation

Checking every certificate by hand can’t keep up with the volume

A delivery arrives with its delivery note, material certificates, sometimes a test report or a declaration of conformity. You have to check that the batch number matches, that the grade or standard cited is the one ordered, that the measured values are within tolerance and that the document is signed. For material certificates, you also need to check that the document type is the one required, for example a 3.1 certificate under EN 10204.

Done by hand, this check takes time and is done by sampling as volumes rise. Discrepancies then slip into production, or surface during a customer audit, when the manufacturing file is already closed. The same work comes back at the end of a project, when a complete quality file has to be assembled for the customer.

How it works

What the agent does, step by step

01 Receiving the set

Documents arrive by email, through the supplier portal or by scan. The agent sorts them by type and links them to the relevant order or file.

02 Reading and extraction

It picks out the useful information in each document: references, batches, standards cited, measured values, dates, signatures.

03 Comparison with the reference

It compares this information with the order, the specifications, the tolerances and the requirements of your inspection plan.

04 Discrepancy report

It lists compliant documents, discrepancies and missing documents, with the relevant passage. Your quality team decides whether to accept or file a claim.

What the agent uses

  • Delivery notes, certificates of conformity and material certificates
  • Test reports, inspection reports and measurement records
  • Purchase orders and specifications in your ERP
  • Your inspection plan, your specifications and your customers’ requirements

What your team gets

  • A control table per batch: document, point checked, result, source
  • The list of discrepancies and missing documents, ready to send to the supplier after approval
  • A quality file assembled and indexed for a customer or an audit
  • Tracking of recurring discrepancies by supplier

You stay in control

The acceptance decision stays human

The agent flags a discrepancy. Accepting, granting a concession on or rejecting a batch remains your quality manager’s decision.

Every discrepancy is shown

For each non-conforming point, the agent shows the value read in the document and the value expected in the reference.

Doubt is flagged

An illegible scan or an ambiguous value is classed as “to check”, never “compliant” by default.

How we measure the result

Every project starts with a free conversation, then a flat-fee audit of your processes, tools and data, deducted from the price if you entrust us with the project.

  • Time spent checking a batch of documents, before and after
  • The share of documents checked, instead of a sample
  • Discrepancies found by the agent and then confirmed by the quality team
  • Discrepancies missed by the agent, found during human checks

Frequently asked questions

Which documents can the agent check?

The ones you already receive: delivery notes, certificates, test reports, inspection reports, inspection sheets. The initial audit starts from your real documents and their usual flaws.

Does the agent read scanned documents?

Yes, after an optical character recognition step. When the reading is uncertain, it flags it instead of drawing a conclusion.

Can it send a claim to the supplier itself?

It prepares the message with the discrepancies and the relevant documents. Sending happens after approval by your team, according to the rules you set.

Does this replace physical inspection of parts?

No. The agent checks documents, not parts. It checks that what is written matches what is expected.

Go from the question to the decision

The fastest way to understand Open Intelligence is to see it answer on your own documents. Describe your need: we’ll come back to you with a tailored solution and a costed quote.